Power Station Exhaust Windbreak Demolition

DE-COMMISSIONING OF POWER STATION EXHAUST WINDBREAK
The close proximity of the new tower & houses an accurate safe clean method was needed.

The power station had to continue running while a new exhaust windbreak and building was constructed close to the exisiting tower. EC Hopkins was tasked with finding a method to remove the old tower, other factors to be taken into consideration were the close proximity of houses in a residenial area as well as other business. The concrete had a large amount of rebar and needed to be handled safely with minium dust and contamination.

We recommended the hydraulic ICS 880F4 Diamond chainsaw powered from the GT18 Power pack. With the operators working from a suspended platform, lifting eyes were attached to a section and with the crane in position they used the ICS saws to first make an accurate horizontal cut and then two vertical cuts, the water feed throught the saw keeping the dust to a minimum. Whilst the crane supported the weight of the cut section, these were then lowered to the ground below.

The ICS 880F4 diamond chainsaws with low vibration and powerful motors enabled a large number of cuts to be made each day, thus ensuring the project was achieved on time and in budget with no disruption to the power station, local residents and businesses.

FOR MORE INFORMATION OR TO DISCUSS A PROJECT CONTACT US ON

+44 (0) 121 506 6095 or email enquiries@echopkins-bham.co.uk

  
   

 

Other EC Hopkins Divisions
Callback Request
Contact Details

EC Hopkins Limited Hydraulics
Unit 1,
82 Kettles Wood Drive
Woodgate Business Park
Woodgate Valley
Birmingham
B32 3DB

Tel: +44 (0)121 506 6095
Fax: +44 (0)121 421 8286
Email: enquiries@echopkins-bham.co.uk

 

 stanley 

ics

husqvarna